How much is the decoration of 42 square meters sma

2022-07-22
  • Detail

Project 1: Foundation Engineering

wall chipping (gypsum plaster) 500.00

wall blank base treatment 250.00

door closure 150.00

door pocket base (Blockboard) 175.00

demolition of brick wall (240 mm) 843.50

light brick wall (120 mm double-sided plastering) 1155.00

opening after wall demolition Painting of beam bottom and other parts 360.00

wall leveling 200.00

floor fall leveling after removal of kitchen partition 200.00

removal of wall and floor tiles 108.00

Project II: Waterway and circuit engineering

waterway construction (lump sum price) 1550.00

change down pipe 518.00

change down pipe 453.60

strong Weak current box installation 100.00

balcony water outlet 300.00

balcony hot water 300.00

strong and weak current construction (lump sum price) 4000.00

Project III: guest restaurant and aisle

latex paint base treatment (putty) 1460.00

latex paint 876.00

shoe cabinet (including door and green board) 2232.00

gypsum board linear light trough ceiling 1029.60

gypsum board sealing on the upper part of the cabinet 65.00

item 4: master bedroom

emulsion paint base treatment (putty) 820.00

emulsion paint 492.00

wardrobe cabinet body (ecological board) 2332.80

wardrobe door (green board) 214.50

gypsum board sealing on the upper part of the cabinet 111.50

gypsum board sealing on the side plate of the wardrobe 119.00

item 5: Kitchen

General specification of wall tiles (300 × 450 < size ≤ 300 × 600) 1320.00

laying vitrified brick general specification (200 × 200 < size ≤ 800 × 800) 307.40

kitchen waterproof treatment 346.50

kitchen and sanitary package pipes 364.00

doorway stone paving 25.00

item 6: bathroom

wall tile general specification (300 × 450 < size ≤ 300 × 600) 825.00

laying vitrified brick general specification (200 × 200 < size ≤ 800 × 800) 139.20

toilet backfilling and surface leveling 168.00

toilet waterproof treatment 765.00

kitchen Sanitary pipe 364.00

lintel paving 25.00

toilet sewer protection project 200.00

item 7: miscellaneous

materials upstairs cost 300.00

materials transportation cost 300.00

indoor garbage removal cost 300.00

lamp installation 200.00

sanitary ware installation 150.00

hardware installation 100.00

finished product protection 300.00

ground fastening 300.00

item 8: other charges

third party supervision 999.00

the above is The quotation of half package decoration of 42 square meters is a basic project decoration, and its reference value is still relatively large. Of course, if you want to know the specific quotation of your home, you'd better ask the decoration company to measure the room. Just in time, Wuhan home decoration network provides decoration bidding services for the majority of Wuhan owners. You only need to enter the decoration bidding page of Wuhan home decoration network, fill in your name, telephone, community and other decoration information, and then you can participate in the bidding, According to your requirements, the platform can select 3 to 4 suitable decoration companies to measure the room for free and formulate decoration plans. The details are OK